Ready for the chill? Why winter planning starts with the team

By Sophie Alvarez, Manager at MILWAUKEE Tools.

Last year, the weather became the single biggest reason UK building firms fell behind schedule.

According to the FMB and CIOB‘s State of Trade Survey, four in ten small building firms reported project delays caused by extreme weather or climate events in the second half of 2025, more than planning delays (36%) or market uncertainty (35%). Nine in ten firms saw some form of delay over the period, up from eight in ten in the first half of the year.

Most contractors already plan for what winter does to materials and equipment. Yet far fewer plan for what it does to their people, and that is where the hidden cost sits.

“A task that takes longer to complete in the cold, or a skilled worker signed off sick for a week, pushes deadlines back and adds to the bill for labour, plant hire and insurance”

How cold hits productivity and safety
Cold weather changes how the body works long before anyone checks a thermometer. Physical strain and injury risk start to climb once temperatures drop below 10°C, and more sharply below 5°C. Stiff hands lose grip and fine control, which matters a great deal when someone is handling power tools or working at height. Cold combined with repetitive manual work also raises the risk of carpal tunnel syndrome many times over. Add slower concentration, longer reaction times and the usual run of winter coughs and colds, and the result is more mistakes, more near misses and more days lost to absence. Every one of those carries a programme cost. A task that takes longer to complete in the cold, or a skilled worker signed off sick for a week, pushes deadlines back and adds to the bill for labour, plant hire and insurance.

“Good winter workwear answers a practical question. How do you keep someone warm without slowing them down?”

Your duty of care during winter
There is a legal dimension too. The Health and Safety Executive and the Construction (Design and Management) 2015 regulations expect employers to account for seasonal hazards in their risk assessments. UK law sets no minimum temperature for outdoor work, so the risk assessment itself becomes the main safeguard. In practice, that means writing cold weather into the method statement, rather than treating it as an afterthought when the first frosty morning arrives. A contractor who has thought through cold exposure, warm-up breaks and suitable clothing stands on far firmer ground than one who treats winter as something simply to endure.

Good winter workwear answers a practical question. How do you keep someone warm without slowing them down? Heavy layers trap heat but cost movement, and a worker who cannot grip or reach properly is neither safe nor productive. This is where heated workwear has changed the picture. Rather than piling on layers, garments now carry heating elements in the lining that the wearer turns up or down as conditions change.

Where heated workwear fits in
MILWAUKEE’s M12 HEXON range works this way. HEXON HEAT TECHNOLOGY™ uses carbon nanotube heating elements that reach required temperature in under two minutes and spread warmth across far more of the garment than earlier designs. Everything runs on the same M12 battery platform as the tools already on site, and heat levels and zones can be set and adjusted through a phone app. There is a puffer jacket for full cover, a vest for milder days or arms-free working, and a hoodie that sits well as a mid-layer, with runtimes of up to 12 hours on a single charge. These pieces form part of Milwaukee’s wider HEXON PPE system, so the heated layers sit alongside the rest of a team’s winter protection.

Workwear is one part of a wider plan. Where the programme allows, schedule the most exposed tasks for the warmest, brightest hours of the day. Give teams a heated welfare cabin and proper breaks to warm up and dry off. Battery-powered tools and site lighting hold up in the cold, where petrol equipment can stall and daylight runs short. When set against the cost of a stalled programme or an avoidable injury claim, none of this is a large outlay. Winter will test every site again this year. The firms that keep working productively through the season will be the ones that prepared their people with the same care they give their materials.